Mon–Sat 8 AM–8 PM · Sun by appointment


Remodeling

Kitchen Remodeling in Greenville, SC

Kitchen remodeling is the planned replacement of a kitchen's cabinets, surfaces, flooring and fixtures to improve how the room looks and works. AKA Remodeling provides kitchen remodeling for homeowners in Greenville, SC and within about 100 miles, pairing cabinet work with tile, hardwood, laminate or LVP flooring installed by the same crew.


Process

How a kitchen remodel runs

The same order every time, so you always know which trade is in the house tomorrow.

01

Free on-site estimate

We measure the room, confirm scope and put the price in writing.

02

Selections and lead times

Cabinets are ordered early — manufacturer lead times decide most of the schedule.

03

Protect and demolish

Floors and openings are protected before anything comes out.

04

Cabinets, tops, floor

Base cabinets first so the countertop can be templated from the installed run, then the floor, tile, hood and trim.

05

Walkthrough

Punch list handled before the crew leaves for the last time.


Why us

What makes us better

01

One crew, one point of contact

The same crew that starts the job finishes it, so nothing is handed between subcontractors mid-project.

02

A written schedule, reviewed daily

You get the plan before demolition and a review of the next day’s work at the end of each workday.

03

Cabinets and floors by one trade

The crew laying your floor is the crew that hung the cabinets, so the transitions and trim actually meet.


Unique gallery

Project images


Good to know

Frequently asked questions

What is a realistic budget for a kitchen remodel?

Budget depends on kitchen size, whether cabinets are replaced or refaced, the countertop and flooring materials, and whether plumbing or walls move. A free on-site estimate turns those choices into a written number.

What is the most expensive part of redoing a kitchen?

Cabinets are usually the largest single line in a kitchen remodel budget, followed by countertops and the labor for any plumbing, electrical or layout changes. Keeping the existing layout is the most reliable way to control the total.

How long does a kitchen remodel take?

Cabinet lead times, set by the manufacturer, and layout changes decide most of the schedule. The crew shares a written schedule before work starts and reviews the next day's plan at the end of each workday.

Does remodeling a kitchen in an older home require lead-safe work?

If the home was built before 1978 and the work disturbs painted surfaces, the EPA Renovation, Repair and Painting Rule requires a lead-safe certified firm using lead-safe work practices.

Can countertops and a custom hood be part of the kitchen remodel?

Yes. Countertop installation and a custom range hood in wood or metal are scheduled in the same sequence as the cabinets and floor. The hood's electrical work is included;

Can interior painting be added to a kitchen remodel?

Yes, as the last stage of the job. For homes built before 1978, see the lead-safe question above.

One crew for the cabinets, the tile and the floor.