Mon–Sat 8 AM–8 PM · Sun by appointment
Remodeling
Kitchen remodeling is the planned replacement of a kitchen's cabinets, surfaces, flooring and fixtures to improve how the room looks and works. AKA Remodeling provides kitchen remodeling for homeowners in Greenville, SC and within about 100 miles, pairing cabinet work with tile, hardwood, laminate or LVP flooring installed by the same crew.
Scope
A kitchen remodel replaces what the room is made of: cabinets, surfaces, flooring and fixtures, sequenced so the work moves in one direction instead of doubling back. Keeping the existing layout is the most reliable way to control the total.
New kitchen flooring
Tile, hardwood, laminate or LVP, with transitions trimmed into adjoining rooms.
Backsplash and wall tile
Set after the countertop template so the joints line up with the finished top.
Process
The same order every time, so you always know which trade is in the house tomorrow.
01
We measure the room, confirm scope and put the price in writing.
02
Cabinets are ordered early — manufacturer lead times decide most of the schedule.
03
Floors and openings are protected before anything comes out.
04
Base cabinets first so the countertop can be templated from the installed run, then the floor, tile, hood and trim.
05
Punch list handled before the crew leaves for the last time.
Why us
01
The same crew that starts the job finishes it, so nothing is handed between subcontractors mid-project.
02
You get the plan before demolition and a review of the next day’s work at the end of each workday.
03
The crew laying your floor is the crew that hung the cabinets, so the transitions and trim actually meet.
Unique gallery
Good to know
What is a realistic budget for a kitchen remodel?
Budget depends on kitchen size, whether cabinets are replaced or refaced, the countertop and flooring materials, and whether plumbing or walls move. A free on-site estimate turns those choices into a written number.
What is the most expensive part of redoing a kitchen?
Cabinets are usually the largest single line in a kitchen remodel budget, followed by countertops and the labor for any plumbing, electrical or layout changes. Keeping the existing layout is the most reliable way to control the total.
How long does a kitchen remodel take?
Cabinet lead times, set by the manufacturer, and layout changes decide most of the schedule. The crew shares a written schedule before work starts and reviews the next day's plan at the end of each workday.
Does remodeling a kitchen in an older home require lead-safe work?
If the home was built before 1978 and the work disturbs painted surfaces, the EPA Renovation, Repair and Painting Rule requires a lead-safe certified firm using lead-safe work practices.
Can countertops and a custom hood be part of the kitchen remodel?
Yes. Countertop installation and a custom range hood in wood or metal are scheduled in the same sequence as the cabinets and floor. The hood's electrical work is included;
Can interior painting be added to a kitchen remodel?
Yes, as the last stage of the job. For homes built before 1978, see the lead-safe question above.
Related services